Cardiac Catheterisation Laboratories in Basingstoke

A wide angle view of a cardiac catheterisation laboratory/ At the rear there is an orange door. Storage units and medical equipment are around three sides of the room. In the centre there is a bed for patients along with a range of diagnostic equipment.

The Trust commissioned Darwin Group to build two new cardiac catheterisation labs to replace an outdated lab and a temporary facility at Basingstoke and North Hampshire Hospital – the first modular build of its kind in the country. 

Portakabin and Darwin Group expand healthcare capability

External three-quarter view of the two-storey hospital building at Airedale. The external classing is white with blue and grey stripes and there are windows at regular intervals on both floors. To the left is the building entrance, with a long, gentle ramp running up to the doors. In the foreground and leading off to the right is a tarmac walkway. The sky is blue and dotted with white clouds.

Modular building market leader Portakabin has today announced the acquisition of healthcare modular buildings specialist Darwin Group in a move that will offer significant benefits to healthcare providers across the UK.

Combining the modular knowledge, scale and financial strength of York-headquartered Portakabin with the specialist healthcare expertise of Darwin Group will now offer healthcare providers both temporary and permanent building solutions to cover all future clinical and non-clinical requirements.

New ward and ICU wins project of the year award

The project team collecting their award at the HEFMA Awards 2022

On Thursday 12th May, Health, Estates and Facilities Management Association (HEFMA), hosted its annual award ceremony in Milton Keynes. AGH Solutions (Airedale NHS Foundation Trust) was awarded ‘Project of the Year’ at the awards for their £15m modular build project that Darwin Group Ltd is delivering.

The project includes a new 15-bed intensive care unit (ICU) and 30-bed ward onsite at Airedale Hospital. AGH Solutions worked hard with Darwin Group Ltd to deliver the project designed to tackle the RAAC risk, the remedial works necessary to keep the building safe, and the development of a 3500m2 ICU and 30-bed ward, which is the first known all-electric inpatient unit in the NHS.

Older Adult Mental Healthcare Modular Accommodation

A hospital corridor, the closest walls are light green with a large print of some sunflowers. The distant part of the corridor is white with a number of doors leading off.

Darwin Group, has handed over a 1,198m2 modular mental health ward for Surrey and Borders Partnership NHS Foundation Trust on the St. Peter’s Hospital campus in Chertsey, Surrey. Guided by HTM and HBN requirements, the building was developed with the Trust to provide inpatients with a more modern and therapeutic environment.

Procure23 | Crown Commercial Service’s Construction Works and Associated Services 2/Procure23 Framework

Three people in high visibility jackets and hard hats, having a conversation. One of them is holding a small laptop computer.

Darwin Group Ltd has become the only Modular, Modern Methods of Construction (MMC) design and build main contractor to be named on the ProCure23 (P23) lots of Crown Commercial Service’s (CCS) Framework. ProCure23 lots is the fourth generation of the ProCure route to market for the provision of design and construction services for the delivery of NHS capital projects with an estimated cumulative value of £9bn over its four-year lifespan.

Please provide the following details so we can follow up on your enquiry.

Please provide some details about your project.

Please provide any further details that will assist with your enquiry.

Please provide the following details so we can follow up on your enquiry.

Please provide some details about your project.

Please provide any further details that will assist with your enquiry.

Please leave your details, and a member of the team will be in touch.